Drain pipe wrapping around the east side of the garage to the back.
 The first load of about 7 loads needed to fill the shell before the floor can be poured.



Today was quite rainy, actually had over 1.5" but the rain didn't stop delivery of more gravel or Jamie filling the shell.  Thursday should be termite spray and Friday the concrete floor.

Comments

Popular posts from this blog